The Project

Allteck was responsible for delivering work on PG&E’s distribution system in the area of Napa, California, supporting emergency restoration efforts. A significant number of customers were left without power due to fires, which required a rapid response and efficient execution from Allteck’s team.

The Challenges

  • Scheduling resources and work to allow for efficient execution during emergencies
  • Access to the structures was very limited and a significant amount were accessed by air using helicopters
  • Working conditions were dangerous as a result of fires, which required more detailed and extensive hazard and risk assessments

 Specialized Work Methods

  • Helicopter work methods for access and mobilization of materials and equipment

Client: Quanta Energy Services

Owner: Pacific Gas & Electric (PG&E)

Category: Distribution Emergency Restoration

Location: Napa, California, USA